News

PT GEOCEAN Indonesia awarded the Ruby Tie in

Shore Approach shallow water Pipeline installation for NISCONI / TOTAL E&P Indonesia - Pearl Energy - Scope of work consist of Nearshore and Shallow water 14” pipeline installation 15m parallel to the South Mahakam pipeline from KP 67.8 (sheet piling near shore line) to KP 57 at water depth EL (-) 15.0m (CD) location (approx 10,800 m) offshore Senipah including Post Trenching of the Nearshore and Shallow water pipeline installation from KP 67.8 (sheet piling near shore line) to KP 61.914 at water depth EL (-) 13.0m (CD) location (approx 5,886 m)

 
 

 

 

PT GEOCEAN INDONESIA - ​www.geocean-indonesia.com / Wordlwide website: www.geocean.com
Offshore Oil & Gas Contractor
Plaza City View 4th Floor
Jl. Kemang Timur 22
Jakarta Selatan 12510 - INDONESIA
Phone: +62-21 718 2018, 718 2019 / ​Fax: +62-21 718 1988, 718 1989