YEAR
|
PROJECT NAME
& LOCATION
|
PRIME Contractor
|
SCOPE OF WORK
|
|
Ongoing
|
Chevron Gorgon
Development Project
AUSTRALIA
|
Sapura Clough JV
|
Shore approach and Shallow water Pipeline Installation
• Pipelaying of 12km of a 20” pipeline
|
|
2011/12
|
TOTAL E&P Indonesia South Mahakam Development Project INDONESIA
|
NISCONI
|
Shore approach and Shallow water Pipeline Installation:
• Pipelaying of 11000m of a 20” pipeline
• post trenching over 6km
• max Water Depth 20m |
|
2011/12 |
PEARL OIL Indonesia Ruby Field Development Project INDONESIA |
NISCONI |
Shore approach and Shallow water Pipeline Installation:
• Pipe laying of 11000m of a 14” pipeline
• post trenching over 6km
• max Water Depth 20m |
|
2010
|
PHE ONJW Maintenance 2009 West Java INDONESIA
|
CATHEM
|
Offshore pipeline installation and risers replacement between platforms:
• 3 X10” pipelines with a total length of 13km Pipe lay
• 1 x 6” pipeline along 2km
• 4 risers’ replacements
• Water Depth from 36m to 47m |
|
2009
|
PETRONAS EPCI West Luttong Pipeline Replacement Project - Miri
MALAYSIA
|
Alam Maritim
|
Shore approach and shallow water pipe laying
• Pipe laying of 4.8 km of 18" pipeline – Max WD 13m
• 700 m beach pull
• Two surface tie-in on 18" pipeline
• Providing shore pull and pipelaying Procedures/eng neering along with Marine Crew |
|
2009
|
PERTAMINA EPCI Tuban Terminal Transit Utama - Tuban INDONESIA
|
IKPT/ HAFAR
|
Shore approach and shallow water pipeline Installation:
• Pipe laying of 3 x 3.3 km of 18" pipeline
• 3 x beach pull
• Pipe laying of 6.2 km of 32" pipeline connected to SPM
• 1 x beach pull
Max Water Depth at SPM location: 35m |
|
2007
|
PETRONAS EPCI West Luttong Pipeline Replacement Project Miri MALAYSIA
|
TLO - PBJV
|
Offshore Pipeline installation & Risers replacement Project:
• Pipelaying of 10 km of 18" pipeline including
1 x beach pull and 1 x riser
• Pipelaying of 2 km of 10" pipeline including 2 x risers
• Pipelaying of 2 km of 24" pipeline including 1 x beach pull (for effluent)
• Surface tie-in on 18" pipeline in 32 m water depth
Max WD: 33m at platform location |
|
2006
|
Total E&P Indonesia EPCI SISINUBI FIELD Development project
Mahakam - INDONESIA
|
Hyundai Heavy Industries
|
Shore approach and Shallow water Pipeline Installation:
• Pre trenching works at Onshore part, 900m length in soft mud,
• Pre-Dredging works at very shallow water area and land fall
• Installation of 19km of 26" offshore pipeline (full Auto Welding)
• 1050m of pipeline push-pull installation
• 18.5km of post-trenching operation
• 6 existing live pipelines crossings
• 2 Near shore tie in |
|
2006
|
PGN EPCI SOUTH SUMATERA WESTJAVA phase 1 INDONESIA
|
NISCONI
|
Shore approach and Shallow water Pipeline Installation:
Labuan Maringgai (SUMATRA) Section
• Shore crossing and shallow water pipe laying: Total 6500m long
•1300m Pre Trenching and Post trenching 2m top of pipe on the whole length.
• 3km in less than 0.5m water depth – max WD 13m
Teluk Banten (WEST JAVA) Section
• Shore crossing and shallow water pipe laying: Total 6000m long
• 410m onshore section - 1600m pre trenched in mangrove and 280m section in coral zone
• Post trenching 2m top of pipe on the whole length.
• Pipeline pre-commisioning
max WD 18m |
|
2005
|
Exxon Mobil Sakhalin 1 - Phase 1 EPC2 – Pipeline & Export Terminal Sakhalin island RUSSIA
|
Nippon Steel Corp.
|
Shore approach and Shallow water Pipeline Installation:
• Installation of 20km of a 24” offshore pipeline across the Tartar Strait (full Auto Welding)
• Storms above 50 knots
• Current stream up to 3.5 knots |
|
2003
|
PGN EPCI SUMATERA - BATAM Gas Line INDONESIA
|
Hyundai Heavy Industries
|
Shore approach and Shallow water Pipeline Installation:
KUALA TUNGKAL (SUMATRA) SECTION
• 12 800m pipe laying of 28" pipeline max WD15m
• 300m section in the pre trench mangrove
• 900m section laid in a pre trench channel (cutter suction dredger)
• 11 600m laid on soft seabed for future post trenching
• 9km in less than 0.5m water
BATAM SECTION:
• 2700m pipe laying of 28" pipeline max WD18m
• 100m onshore section ,900m section in the pre trench mangrove, 280m section in a pre trench coral zone
• 1420m laid on seabed for future post trenching |
|
1999
|
SHELL EPCI LPG TERMINAL PROJECT Colombo SRI LANKA
|
GEOCEAN
|
Offshore Pipe laying & Single Point Mooring Installation:
• SPM type CALM buoy with PLEM 60t,
• 4km of 10" Offshore Pipelaying
• all post-trenched with 0.5 to 2m cover
• 2km of 10" Onshore Pipelaying
• 3 HDD sections: 710m under lagoon, 600m and 530m under canal alongside road.
• Construction of Pig Launcher/Receiver, Pipeline filters, Metering Station.
• Water depth: 36m at SPM site location |
|
1998
|
EPCI WATER INTAKE FOR POWER PLANT PHILIPPINES
|
GEOCEAN
|
Offshore Steel Water Intake pipeline Installation:
• Installation of 400m 48" pipeline – Max WD 15m
• Fabrication by 24 m elements, flange connection
• Cathodic protection with sacrificial anodes
• 4’’ internal PVC pipe for chlorination
|
|
1998
|
TOTAL EPCI NAPHTA IMPORT TERMINAL MYANMAR
|
GEOCEAN
|
Offshore pipeline installation & Conventional Buoy Mooring installation :
• Installation of 600m 6" offshore pipeline – max WD 18m
• Installation of 8km of 4" Onshore pipeline
• Installation of 5 x CBM + PLEM
• Pre Trenching and Pipe pulling
|
|
1998
|
TOTAL E&P Indonesia INDONESIA TUNU – PECIKO river crossings
|
PT Citra
|
Shore approach, shallow water pipe laying and River Crossings:
• 2900m Pipe laying of 42" max WD 22m
• 6300m Pipe laying of 8", 20" and 24" max WD 17m
• Full pre-surveys and post-surveys of pipelines.
• Dredging through sand banks with cutter suction barges to prepare access channels for lay barge and trenching barges.
• Dredging with clamshell dredger of clusters on rivers banks.
• Installation of concrete mattresses on pipeline crossings areas.
• Gravel dumping on pipeline sections. |